Data centers
24/7 critical load with design availability aligned to Tier III and Tier IV. Firm behind-the-meter power, independent from grid contingencies.
Explore the solutionWe invest. We build. We operate.
Firm generation with 99.995% reliability.
Backing
Backed by Grupo Gemex

GEMEX Energía
Wind and solar development
1,250 MW developed

INVER México
Infrastructure supervision
+439 MW supervised

Marcol
Environmental management
25+ years of experience

EXUS México
Renewable asset management
2,205 MW under management

Luxem Energía
Qualified energy supply
12+ TWh delivered

BEEL Infrastructure
Infrastructure financing
$600+ M USD in assets

Fazt
Electric mobility
5,000 charging points by 2030
GEMEX Autoconsumo
On-site power with natural gas
3–20 MW per project
The group synergy
We develop, finance, build and operate natural gas generation. And we do not arrive alone: Luxem secures the molecule and Marcol clears the path. A holistic group solution, with a single point of contact.
Meet the group →Generation
The molecule
The path
Verticals
We develop tailor-made projects from 3 to 20 MW. We are not small-scale distributed generation: we design, finance and operate power plants for critical loads.
Check your gas corridor ↓24/7 critical load with design availability aligned to Tier III and Tier IV. Firm behind-the-meter power, independent from grid contingencies.
Explore the solutionCentralized generation inside the park with distribution to multiple facilities. Competitive, reliable power as the park's strategic amenity.
Explore the solutionA dedicated plant for your operation: firm capacity for continuous processes, with cogeneration when your process uses the useful heat.
Explore the solutionReliability
99.995%
design availability · Tier IV · N+1 / 2N
Aligned to the Uptime Institute standard: Tier III (99.982%) and Tier IV (99.995%).
REL-01
Real generation redundancy: maintenance without interruptions and tolerance to equipment failures.
REL-02
Your power is generated inside your site. Grid contingencies stop being your operational risk.
REL-03
A price agreed by long-term contract. No exposure to tariff volatility, with an energy cost you can finally project.
Developers by nature
We put up 100% of the capital. You only pay for the energy you consume, at a price below the CFE tariff.
Our shareholders include principals of one of Mexico's leading industrial groups, operators of an efficient 145 MW cogeneration plant.
100%
The investment · ours
0
Your capex
The group's network






























Trademarks and logos belong to their respective owners.
Tell us about your consumption and your site. The technical assessment is free and with no commitment.
Request an assessment